
Files
Choose a part or variant
Gazebo
Template Hammer JSON · 1,953 structures · 33 unique types · 837 KB
Treehouse
Template Hammer JSON · 1,995 structures · 29 unique types · 854 KB
Gazebo V2
Template Hammer JSON · 1,953 structures · 34 unique types · 832 KB
Materials
What this build is made of
Resource costs are not published yet. The full piece breakdown below is exact.
Piece breakdown — 38 structure types, 5,901 pieces
| Structure | Count |
|---|---|
| BP TriCeiling Stone | 1,071 |
| Railing Wood | 657 |
| Ceiling Stone | 570 |
| Pillar Flat Stone | 450 |
| BP TriCeiling Wood | 420 |
| Pillar Stone | 298 |
| Pillar Flat Half Stone | 282 |
| BP TriRoof Wood | 192 |
| Ceiling Wood SM | 186 |
| BP Wall Sloped Shallow Left Inverted Stone | 144 |
| BP Wall Sloped Shallow Right Inverted Stone | 144 |
| StructureBP Wall Half Stone | 144 |
| BP TriRoof Inverted Wood | 126 |
| Pillar Half Stone | 124 |
| WoodRoof SM | 120 |
| StructureBP Railing Inverted Wood | 108 |
| BP Ramp Stone | 84 |
| StructureBP Railing Sloped Wood | 75 |
| Beam Stone | 72 |
| BP Roof Half Stone | 72 |
| StructureBP Railing Shallow Inverted Wood | 72 |
| StructureBP Railing Shallow Right Inverted Wood | 72 |
| StructureBP Railing Sloped Right Wood | 51 |
| BP Railing Half Wood | 48 |
| Wall Stone | 48 |
| Pillar Thin Stone | 36 |
| StructureBP Roof Corner Left Inverted Wood | 36 |
| StructureBP Roof Corner Right Inverted Wood | 36 |
| BP Ramp Wood | 27 |
| Floor Stone | 24 |
| Ramp Stone | 24 |
| StructureBP Roof Corner Left Stone | 24 |
| StructureBP Roof Corner Right Stone | 24 |
| Pillar Flat Thin Stone | 15 |
| StructureBP Railing Sloped Inverted Wood | 12 |
| BP TriRoof Inverted Stone | 6 |
| Pillar Half Thin Stone | 6 |
| TreePlatform Metal SM | 1 |
Setup
How to use this template
- Install Template HammerOpen ARK: Survival Ascended on PC with the required content listed above.
- Get the build dataCopy JSON import data or download the native .template file for the selected build.
- Import and previewPaste or load it in Template Hammer, then review placement and resources before confirming.
